Appendix 25.130. STORMWATER SYSTEMS ORDINANCE Effective: September 30, 2014 |
§ 25.142. First flush basins and sediment collection units.
When stand-alone BMPs such as permanent first flush basins and prefabricated sediment collection units are proposed or required for a specific site, the following design standards shall apply:
A.
A first flush basin or pre-fabricated sediment collection unit shall contain storage volume for the first one (1) inch of runoff from the on-site impervious tributary area. The storage volume of a first flush basin can be calculated as:
V ff (cf) = A x C x 3,630 cf/ac-impervious
B.
The outlet of a first flush basin or sediment collection unit shall be designed to release the first flush volume over 24—36 hours.
C.
The outlet of a first flush basin or sediment collection unit shall not be submerged by the receiving watercourse at a 10-year design level.
D.
The first flush basin or sediment collection unit shall contain a bypass structure and/or berm to allow the 10-year peak flow to bypass without hydraulic interference.